Saturday, March 9, 2013

What a different a year makes...

Here are some comparison pictures of the construction site. The first two are from March of last year. The library was built in the front empty corner of the lot utilizing the front perimeter wall as part of the structure. Note the doorway and four high windows on the wall that are now in he room.

Will post more later today...







No comments:

Post a Comment